Hornberget Wind Farm
| Location | Västerbotten. Sverige |
| Number of Turbines | 5 |
| Turbine Type | Vestas V90 |
| Turbine Rating | 2 MW |
| Total Installed Capacity | 10 MW |
| Owner | Jämtkraft AB |
| Year of Operation | 2007 |
| Location | Västerbotten. Sverige |

|
Nordisk Vindkraft has built a wind farm on Hornberget at the
abandoned Kimheden Mine near the village of Aspliden in the
municipality of Malå in Västerbotten County.
The Hornberget site is well suited for wind power production. One
reason is that the project is built where mining operations were
previously conducted, which means there was already a roads
infrastructure in place, making it a natural choice. The site is
also extremely windy.
The County Administrative Board, the municipality and nearby
residents are positively disposed towards a wind farm in the old
mine area.
Work on Hornberget started in May 2006 and the wind farm was
finished, commissioned and handed over to the owner, Jämtkraft, in
April 2007.